- The Foxfarm subdivision had approximately 150 serviced lots, consisting of a mix of townhouses and singles.
- The project involved installation of Conspan Bridge over creek which was approximately 32 LM x 7 LM Wide.
- Also required was installation of approximately 400 LM of Concrete Pressure Pipe.
- A 3 Line sewer system was used.
- 2 watermains were installed on the main roads to feed existing subdivision and new development.
- Approximately 2 KM of roads were constructed.
- Box culverts were installed to allow large water flow.
- Red shale/clay posed was encountered and posed a challenge, but was resolved.