OUR
PROJECTS
Foxfarm Subdivision
South Park Road Sanitary Reconstruction
Inn on the Park
Taunton Subdivision
Village of York
Cathedraltown Subdivision
Homestead Subdivision
244 Finch Avenue Subdivision
Enclaves of Upper Canada
The Heights of Harmony
Vaughan NW Residences Residential Subdivision
Dufferin Vista Phase 1
HOW CAN WE HELP?
Thank you for contacting us. We will get back to you as soon as possible.
Foxfarm Subdivision
OAKVILLE
2011
SCS CONSULTING GROUP
- The Foxfarm subdivision had approximately 150 serviced lots, consisting of a mix of townhouses and singles.
- The project involved installation of Conspan Bridge over creek which was approximately 32 LM x 7 LM Wide.
- Also required was installation of approximately 400 LM of Concrete Pressure Pipe.
- A 3 Line sewer system was used.
- 2 watermains were installed on the main roads to feed existing subdivision and new development.
- Approximately 2 KM of roads were constructed. Box culverts were installed to allow large water flow.
- Red shale/clay posed was encountered and posed a challenge, but was resolved.
South Park Road Sanitary Reconstruction
Markham
2019
SCS CONSULTING GROUP
- A new sanitary sewer was installed within an existing road and removal of existing system.
- Involved upsizing of sanitary sewer to accommodate future construction of several condo towers.
- This project required bi-pass pumping to maintain sanitary flow within the existing and new sewer.
- 3 months closure was allowed to construct approximately 3 KM of sanitary sewer.
- All sewers were installed in vertical trenches using trench boxes and slide rails.
- After sewer installation, a complete road resurfacing once done.
Inn on the Park
Toronto
2019
RV Anderson
- The project includes servicing for Tridel Developments at Leslie and Eglington.
- A new sewer was installed on Leslie to new Inn on the Park Drive.
- The requirement was to maintain traffic on Leslie Street and only allowed to occupy 2 lanes with construction equipment.
- The depth of sewer was approximately 6 LM within a tight confined area.
- A vertical trench construction methodology was used to lessen to road disturbance.
- A jack and bore section of sanitary sewer was used to maintain traffic.
Taunton Subdivision
Pickering
2017
Cole Engineering Ltd.
- This project involved approximately 600 + serviced lots.
- Included the installation of over 6 km of sewers along with roads and concrete curbs.
- There were 3 sewer systems installed at once.
- This project involved a complicated sewer system that had numerous drop structures.
- A storm water management pond was constructed, which included hardscaping and landscaping.
Village of York
Toronto
2006
Sernas and Associates
- This project involved approximately 200 serviced lots.
- Included the installation of deep 9 m + deep sewer within an established University campus.
- The New City of Toronto standard was employed in building the laneways in concrete pavement versus the traditional asphalt pavement.
- A new sanitary sewer was installed via Jack and Bore across Sentinel Road.
- There were 6 storm and sanitary connections into existing stubs on highly trafficked roads that needed to be maintained.
- All the services were for townhouse blocks.
Cathedraltown Subdivision
Markham
2003
MMM Group
- Former property was Romandale Farms.
- Approximately 400 serviced lots were constructed, 200,000 m3 of earthworks moved and 5 KM of roads constructed.
- A subdivision was constructed during the construction of the Cathedral.
- Dewatering was employed to draw down the water table to allow sewers to be installed at the design elevations.
- Several creek crossings were constructed to maintain the Ministry of Environment natural flows.
Homestead Subdivision
Brampton
2009
Urban Ecosystems
- Involved 400 + acres of agricultural farm in rural Brampton transformed into a fully functional master plan community.
- Considered one of the first large master plan communities in the City of Brampton.
- The project was approximately 2,400 Lots in over 15 phases.
- Over 1,000,000 m3 of earth moved to level area, and over 10 KM of roadway was constructed.
- Blasting was used to break bedrock and shale to allow excavation to progress.
- Project consisted of earthworks, underground servicing (storm, sanitary and watermain) and roadworks.
244 Finch Avenue Subdivision
Pickering
2020
Condevcon Consulting Engineers
- Installation consisted of approximately 70 units of Stormtrap system versus an open Storm Water Management Pond.
- A culvert was embedded across Altona Road during a 5 day closure.
- Approximately 108 dwelling units were serviced during this time.
- All existing utilities were brought in from existing travelled roads.
Enclaves of Upper Canada
Georgetown
2014
RV Anderson and Associates
- Former property of Upper Canada College which was redeveloped into a subdivision.
- Involved the installation of a double stack sewer.
- A double cut of sewer for deep installation of bottom sewer was done. Depth is approximately 14 M. This could not be excavated safely, so a double cut methodology was needed.
- All existing utilities were brought in from existing travelled roads.
- A micro tunnel was used to install sewers across Hwy 7 along with sewers to the pond due to the vicinity of existing properties.
- Unorthodox construction of pond with the subdivision to allow constructible land.
The Heights of Harmony
Oshawa
2022
Candevcon East Limited Consulting Engineers & Planners
- 136 lot subdivision
- Complete servicing and roadworks. Inclusive of foundation drain collector system, domestic water system, sanitary system and storm system.
- Jack and Bore Tunneling methodology to cross existing TransCanada Pipeline system.
- Construction of New Storm Water Management Pond inclusive of geosynthetic liner and hardscapes.
- Over 2 KM of road constructed.
- Outfall construction within conservation preservation areas, during allowable time frames.
Vaughan NW Residences Residential Subdivision
Vaughan
2022
Schaeffers Consulting Engineers
- 174 lot townhouse subdivision.
- Complete servicing and roadworks.
- First of its kind. I-Storm underground stormwater storage tank. Similar characteristics as a conventional Stormwater Management Pond but underground and useable land above ground.
- Connections onto heavily used existing subdivision road with minor interruptions to existing businesses.
- Installation of shoring wall to protect existing properties to allow installation of Istorm system with minimal horizontal clearances.
- 500 MT crane used to install I-Storm system.
Dufferin Vista Phase 1
Vaughan
2022
Vellore Engineering
- 30 lot subdivision.
- Clearing and Grubbing.
- Complete earthwork.
- Import of fill of over 20,000 m3.
- Complete servicing and roadworks.
- Inclusive of a 675 mm diameter concrete Clean Water Collector system.
- Servicing through park easement without interruption to park area.
- Connection of sewer onto spine road with minimal impact to traveling public.